Week 3 (14 hours): This weekend #2 for the show we are working on, "Puffs".
2/25-2/27 Show Weekend #2: During the show weekend our job consists of making sure the actors mics are on and working, hitting cues at the right times during the run of the show and making sure volumes are raised or lowered as needed for each actor in each scene.