Tuesday, August 6, 2019

Gradwell House Week 8

August 1st
- Checked and reset rehearsal rooms
- Cleaned up dishes and kitchen area
- Tore down mics and drum kit in the control room
- Setup for a session in the tracking room
- Setup and troubleshooting cue system with another intern
- Setup patch bay for session
Hours: 8

August 2nd
- Checked rehearsal rooms
- Moved drum kit into an isolation room
- Setup for tracking session and helped band load into the studio

- Shadowed at a concert at Neshaminy Creek Brewery
- Helped with setup, soundcheck, set changes, and load out
Hours: 13

August 4th
- Checked and reset rehearsal rooms
- Cleaned up dishes and kitchen area
- Put away gear left out in the lounge
- Setup cue system for a freelance engineer
- Helped setup and mic the drum kit, sat in on drum session
- Setup and sat in on bass guitar tracking session
Hours: 12

Total Hours: 33